CCEER

Projects

 

October 5th, 2009

Precast Bridge Columns with Energy Dissipating Joints - SC-2 (1/3-Scale Precast Segmental Concrete Column)

August 12th, 2009

Emergency Repair of Damaged Bridge Columns Using Fiber Reinforced Polymer (FRP) Materials - OHS (1/3-Scale Repaired Old-Design High Shear Column)

August 6th, 2009

Emergency Repair of Damaged Bridge Columns Using Fiber Reinforced Polymer (FRP) Materials - OHS (1/3-Scale Old-Design High Shear Column)

July 30th, 2009

Specimen Design and Testing Piles Extension Connection to Slab Bridges - FSKJ24-Experiment

July 17th, 2009

Emergency Repair of Damaged Bridge Columns Using Fiber Reinforced Polymer (FRP) Materials - NHS2 (1/3-Scale Repaired New Design High Shear Demand Column)

June 30th, 2009

Specimen Design and Testing Piles Extension Connection to Slab Bridges - DCKJ24-Experiment

June 23th, 2009

Experimental Cyclic Studies on a Three-Girder Steel Bridge Subassembly Model

June 12th, 2009

Telescopic Pipe-Pin Project

April 17th, 2009

Specimen Design and Testing Piles Extension Connection to Slab Bridges - FSRCC24-Experiment

April 18th, 2002

Impact of Aspect Ratio on Two-Column Bent Seismic Performance

March 14th, 2002

Effect of Eathquake Load Pattern on The Response of Two-Column Bridge Bents with In-Fill Wall Retrofit